by Tim Floyd | Sep 27, 2018 | Material Flow
There are only three manufacturing bottlenecks that matter: demand in, flow-through and people around. They all connect to each other and any other apparent bottleneck can be grouped under one of these primary bottlenecks. A bottleneck is a step or point in a process...
by Tim Floyd | Sep 24, 2018 | Lean Manufacturing
As lean integrators, we’ve seen all types of manufacturing and production operations and all sorts of issues that prevent those operations from achieving their next level of success. Here are a few common issues we see and insights into how lean can be applied to...
by Tim Floyd | Sep 13, 2018 | Lean Implementation
It’s fun to go on benchmarking trips. It’s fun to go see Toyota or Toyota-inspired operations in Japan. Everyone comes back from those experiences with a head full of “what could be” and ideas on what to change, all at the same time. Then they get back to their plant,...
by Tim Floyd | Sep 5, 2018 | Forklift Free
One of our key phrases at Geolean is “Get the fork outta here!” When we work with clients to create their lean system, removing forklifts from the manufacturing area is often one of the first initiatives. Getting rid of forklifts makes sense, but it’s not always an...