by Tim Floyd | Mar 29, 2017 | Website Blog
Integrate Part Protection and Material Flow Carts with integrated part protection are a great way to control and manage WIP inventory. Instead of double handling WIP parts by putting them in a container, storing that container, and then putting that container on a...
by Tim Floyd | Mar 27, 2017 | Website Blog
The Navy has a problem – only 47% of their jets could fly right now. 47% operational readiness = 53% aircraft on ground. 53% of a potential resource unable to be used for the intended purpose. It’s not only the jets. There is also a backlog of ship refits. From...
by Tim Floyd | Mar 24, 2017 | Website Blog
An interview with Geolean founder Ludovic Ott was published in the magazine L’Opinion. Much of the discussion references conditions for French industry, but the same issues are equally present in North America. Original article in French, English translation...
by Tim Floyd | Mar 23, 2017 | Website Blog
Jeff Immelt, CEO – GE, gave a set of interviews with LinkedIn this summer. Although it’s been a few months, the discussion points apply just as clearly now. I’d like to highlight a few statements that caught my ear specifically in a manufacturing context. Take a few...
by Tim Floyd | Mar 21, 2017 | Website Blog
Most people familiar with the concept of lean manufacturing and standard production systems have heard of the seven wastes. If you haven’t, you’re probably going to skip this post and move on. If you have, there is an important point you may not have considered. There...